IP54 standard — dust-tight and moisture-resistant. Powder-coated steel enclosure with full gasketing on all doors. Works in cement plants, sugar mills, and coastal installations without additional enclosure upgrades. Higher IP ratings available on request.
-
DOL, star-delta, soft starter, and VFD configurations. Standard feeder rating 400A to 630A. Schneider and ABB contactors and breakers as standard. We match starter type to motor load characteristics based on your motor list and application profile.
-
Yes. Our engineers guide your site electricians through commissioning via video call. We walk through busbar torque checks, insulation testing, functional verification, and protection coordination. Documentation package includes step-by-step commissioning checklists in English and French.
-
Standard MCC configurations ship in 4 to 6 weeks from our factory. Custom engineering adds 2 to 3 weeks. Sea freight to Mombasa, Dar es Salaam, or Luanda takes 3 to 4 weeks. Door-to-door delivery within 7 to 10 weeks for most East African ports.
-
Yes. We mix starter types within the same MCC lineup. VFD compartments for pumps and conveyors that need variable speed. Soft starters for large motors to reduce mechanical stress. DOL starters for simple on/off applications. Each compartment is independently designed for its function.
-
All our motor control centres are IEC 61439-1 type-tested. CE certification standard. We also configure for destination market requirements — SASO, SONCAP, PVoC, and others. Each MCC cabinet ships with IEC type-test reports, FAT certificates, and material compliance documentation.
-
A motor control center controls, protects, and manages motors. A distribution panel only splits power to circuits. MCCs include motor starters, overload relays, contactors, and control logic for each motor. If your facility has five or more motors, centralized control through an MCC panel saves downtime and simplifies maintenance.
-
Every panel passes mandatory five-stage QC: incoming material inspection including copper purity verification, in-process drawer fitment and contact resistance audit, 2500V/1min dielectric withstand test, full mechanical interlock and drawer insertion cycle testing, and pre-shipment final inspection with serial-numbered traceability. Third-party SGS or BV inspection available on request.
-
We recommend stocking at least one spare drawer unit per rating. We maintain spare drawer units, contact finger sets, position switches, and secondary disconnect plugs in inventory with DHL express shipping. 24-month warranty from commissioning. 24-hour technical response. Optional on-site commissioning by field engineers.
-
Standard MNS configurations with off-the-shelf drawer units ship in 6 to 8 weeks. Custom designs with non-standard drawer sizes and special busbar ratings take 10 to 12 weeks. The critical path is often imported circuit breakers — Schneider, ABB, and Siemens breakers typically have 4 to 6 week regional distributor lead times.